2. Turn-Up and Test

31

031-132-B0-001 Rev. A

TM

©2000

2.2

Initial Operation, continued

2.2.3 Starting a Local APU Test, continued

11. Adjust pre-regulator, or dual regulator (located on gas bottle assembly

for Propane) if necessary by removing regulator cap and adjusting for
11” ±1” of water column pressure.

12. Set RAS to “STOP”.
13. Remove brass manometer fitting and re-install plug to demand

regulator input monitoring port using approved pipe sealant.

14. Check demand regulator input monitoring port for leaks.
15. Set RAS to “AUTO”.
16. To continue functional test on power node system, refer to ECM

certification section in ECM manual (744-862-C0) page 47.