Ln line (leak) – Franklin Fueling Systems TS-TPI User Manual
Page 29

5
Page
5-2
TPI AND LINE LEAK TESTING
TS-TPI Installation and Wiring Guide
Line Leak Test Requirements & Notes:
1)
Inform the Site Personnel to: (If the store closes at night - not 24-hour) Leave
the Pump Controllers power on at night with dispenser power off. The
Submerged Turbine Pump (STP) must be able to turn on to run the pressurized
line leak tests.
2)
It is recommended that Line Leak Tests and Tank Leak Tests should not be
scheduled to run at the same time.
3)
Note:
The Monthly (0.2 gph) precision Line Leak Test will begin after 3 hours of
quiet-time
between product dispensing. (The line leak detector can start the
pump at any time to run pressurized line leak tests.)
4)
The annual (0.1) precision line leak test requires 6 hours of
quiet-time
(after the final dispense) before it will begin testing. Make sure to take this
into account when scheduling a Annual precision 0.1 Line Leak Test.
5)
Note:
See the TS-LS300 AutoLearn User’s Guide or consult INCON Technical
Service for Special Applications (for example: manifolded lines, nonstandard
pumps, etc.).
6)
Before programming, reference the State and Local Regulations about line leak
testing, type / precision of the tests, test frequency, and reporting
requirements... adhere to these requirements.
LN Line (leak)
LN Line (leak)
LN Line (leak)
LN Line (leak)
LN Line (leak) T
T
T
T
Tests Men
ests Men
ests Men
ests Men
ests Menu
u
u
u
u
* Only the No. of lines that are programmed in System menu will be displayed
SCHEDULE
Press the
M1
key.
SELECT A LINE
LINE 1
Use (
M
) keys to select a LINE#.
LINE 2 *
Use
UP/DOWN
▲
▼
keys to show more choices.
:
*
LINE 8 *
LINE TEST SCHEDULE N
Program a Schedule and Time for each Line#
SCHED 0.1
0.1 = Precision Annual Line Leak Test
NONE
No schedule / not scheduled
DAILY
MONDAY
Use
UP/DOWN
▲
▼
keys to show more choices.
: