Many systems are shipped with the appropriate controller connections wired by the factory. The following provides
a brief description of how and what to connect to the controller. Use only those sections that apply to the system
configuration.
Step
Action – Millennium II
1
Power and Sense Connector
Connect and wire to shunt and alarms.
P6 is a 6-pin connector provided for analog interface to a plant shunt, distribution alarms, and open battery
string alarms. Typically a factory installed plant wire harness plugs into this connector. This wire set has a
purple wire with a Faston ® receptacle for connecting the Open String Alarm from field installed battery
disconnect breakers.
Table 7 Power and Sense Signals - Millennium II
Pin
Signal
1
Shunt+
2
Shunt Reference
3
Shunt-
4
Fuse Alarm Major +24V
5
Open String
6
Fuse Alarm Major -48V
2
1-Wire Peripheral Connector
Connect and wire to VT-Probe, external ambient probe, or Remote Voltage Monitor.
P7 is an RJ-45 receptacle for connecting to 1-Wire devices.