Connect load wiring, Figure 53 battery bus labels, Figure 54 distribution assignment record label – GE Industrial Solutions H5692448 Power Systems Infinity M1 (NE-M) User Manual
Page 35

NE-M
Installation Guide
H5692448
CC848815325 r06 May 2013
35
Step
Action
1
Verify that the measured voltage matches
the bus label using a meter.
Figure 53 Battery Bus Labels
Connect Load Wiring
Figure 54 Distribution Assignment Record Label
WARNING: Shock Hazard and Equipment Damage
Do not install circuit breakers or load fuses until the load equipment is ready to be
energized.
When a load is ready to be energized
1. Connect the load to the distribution panel.
2. Install the circuit breaker of fuse.
CAUTION: Equipment Damage
Ensure Circuit Breakers are in the OFF position prior to installation.
Ensure Fuse Holders are empty prior to installation.
Notes:
1. Start from the top most position and work down the panel. This will allow orderly and managed cable
dressing as loads are added in this installation and in the future.
2. Connect the Load Return cable before the Load cable for each load.
The Load Return connection is blocked by the Load cable, if installed.
3. Follow steps of each section below as appropriate to breakers and fuses to be installed.
4. Repeat steps of each section as appropriate.
5. Bolt-in breakers may be factory installed.
-48V Battery Bus
+24V Battery Bus
Blue
Orange
Note that a space to record the
distribution assignments is available on
the inside of cabinet door:
Distribution
Identification