beautypg.com

Preparing the system for maintenance, Removing the power supply, Connect the new power supply – Nortel Networks BCM50 User Manual

Page 172: To remove the power supply

background image

172

Chapter 20 Replacing a power supply

NN40020-302

Preparing the system for maintenance

In most cases, if the power supply for the main unit is faulty, the system is already shut down. If
this is the case, proceed to

Removing the power supply

on page 172. If you replace the expansion

unit power supply, or if the system is still operating, perform the procedure

To shut down the

system

on page 170.

Removing the power supply

Before you disconnect the power supply, read the warnings about connecting network lines in

Wiring warnings

on page 105.

To remove the power supply

1

Remove the telephony and data networking lines from the BCM50 units. These lines include:

the RJ-21 telephony connector on the main unit

the ADSL line in the WAN port on a BCM50a main unit

any analog telephone lines in the media bay modules (MBM) in the expansion units

any digital telephone lines in the MBMs in the expansion units

2

Rotate the power supply retention clip to free the power supply cord.

3

Remove the power supply cord from the BCM50 unit.

4

Remove the power supply cord from the AC wall outlet.
If your system has a UPS, remove the power supply cord from the UPS socket.

5

Remove the power supply from the table, rack-mount shelf, or wall-mount bracket.

6

Proceed to

Connect the new power supply

on page 172.

Connect the new power supply

Before you connect the power supply, read the warnings about connecting network lines in

Wiring

warnings

on page 105.

Warning: Leakage currents

You must disconnect the telephony and data networking cables from the system before
disconnecting the power cord from a grounded outlet.