Project Engineering for the OPC Server

57

Commissioning PC Stations - Manual and Quick Start
Release 5/2005

C79000-G8976-C156-07

5.1

Significance of Project Engineering

The OPC Server Application Type

The OPC Server can be configured as an interface to all available communication
protocols. You can create this object only once in a PC station.

You can then use this OPC Server for communication from user programs (OPC
clients).

What Can be Configured in the Project Engineering Database?

You can configure the
following:

S

Protocol and
service-dependent
properties

S

Properties for specific
connections

OPC client (e.g., operator control

and monitoring system)

Protocol software from SIMATIC NET

Communications processor from

SIMATIC NET

Data Access

Alarms & Events

OPC Server for SIMATIC NET

Standard Situation: Using the Default Settings

In the simplest case (in other words, the standard situation), you simply need to
create the OPC Server in the PC station. You must also create the
communications modules used in the station and plan communication connections.

The steps are described in detail in Section 13 Project Engineering with SIMATIC
NCM PC.

Using Default Settings or Project Engineering Parameters

The parameters you can set with NCM PC all have default settings so that in most