Follow the steps outlined below:

3.

Repeat these steps for all submodules.

4.

Save and compile the configuration.

13.8.2

Configuration with a “Third - party” DP Master

DP master system for configuring the DP slave

If the DP master engineering cannot be done in NCM / STEP 7, however you want
to engineer the PC station used DP slave in NCM / STEP 7, you will have to create
a substitute DP master with a DP master system in the S7 project. This can be a
PC station as already described in this chapter or a SIMATIC S7 station.

Create this substitute master in the project engineering just like a real DP master.
You then simply require the project engineering data for the DP slave.

Supplying the DP master with data from the GSD file

The real DP master is supplied with the configuration data of the DP slave from a
GSD file.