Getting Started “Configured Mode”

38

Commissioning PC Stations - Manual and Quick Start

Release 5/2005

C79000-G8976-C156-07

How to Make the ”Initial Configuration with an XDB File”

3

If you want to prevent project engineering data from being transferred online at a later point in
time, select the “Work offline...” option...”. The default is that project engineering data can be
transferred online.

Result:

PC station is ready for productive communication

S

Module addresses are set;

S

Communication connections configured in the project engineering
are established;

S

Variables can be accessed using symbols configured in the project
engineering.

Tip:

You can also follow this procedure in the example “OPC Configuration for Industrial
Ethernet” in this manual; see Section 7.

Where to we go from here?

you can now use the other tools from SIMATIC NET for diagnostics,
commissioning, and testing.

See also Section 1.3.