beautypg.com

3 getting started “pg operation, Pg operation, 3getting started “pg operation – Siemens Commissioning PC Stations C79000-G8976-C156-07 User Manual

Page 41

background image

3

Getting Started “PG Operation”

41

Commissioning PC Stations - Manual and Quick Start
Release 5/2005

C79000-G8976-C156-07

3

Getting Started “PG Operation”

This chapter shows you how you can configure your PC module in PG operation.
In this situation, we distinguish two modes:

S

Programming device (PG/PC)

S

HMI stations

The default setting for the PC modules is PG operation.

Requirement: SIMATIC NET PC software and hardware are installed

Before you work through the steps described here, you must first install the
SIMATIC NET software and the hardware on your PC station.

S

Installing SIMATIC NET PC software

Follow the procedure described in the Installation Instructions that accompany
every SIMATIC NET PC module to install the products of the SIMATIC NET PC
Software CD.

S

Installing hardware (PC modules)

Install the hardware in your computer as described in the Installation
Instructions that accompany every module.