beautypg.com

Siemens Commissioning PC Stations C79000-G8976-C156-07 User Manual

Page 30

background image

2

Getting Started “Configured Mode”

30

Commissioning PC Stations - Manual and Quick Start

Release 5/2005

C79000-G8976-C156-07

Steps in Project Engineering

5.

Save the configuration.

(omitted if data entered by the PC Station Wizard)

6.

Change to NetPro to network the station and to create the connections in the project
engineering.