SMA WB 3600TL User Manual
Page 29

SMA Solar Technology AG
Electrical Connection
Installation Guide
WB36TL_50TL-IEN102011
29
5.3.2 Connecting the Inverter to the Power Distribution Grid (AC)
1. Check that the grid voltage is within the admissible voltage range.
The exact operating range of the inverter is specified in the operating parameters. The
corresponding document is located in the download area at www.SMA.de/en, in the
"Technical Description" category of the respective inverter.
2. Disconnect the line circuit breaker and secure against re-connection.
3. Ensure that the small wind turbine system is stopped and secured so it will not restart.
4. Remove the Electronic Solar Switch.
5. Loosen all six captive screws and remove lid.
6. Check whether the inverter has been set to the correct country standard using the rotary switch.
Please refer to section 5.5.1 ”Checking the Country Standard” (page 40) for an overview of
switch positions for country standards and the display language. Factory settings of the inverter
are provided on the supplied supplementary sheet.
7. If the inverter is not set to the desired country standard, then adjust the country standard as
described in section 5.5.2 ”Setting the Country Standard and Language using Rotary Switches”
(page 43).