K2-svr-nh10ge basic nearline, K2-svr-nh10ge redundant nearline, Cable k2 raid – Grass Valley K2 (Summit 3G) 10Gv2 Storage Area Network Installation v.8.1 User Manual
Page 57

If you have more than one NH1 server, balance servers between controller 0 and controller 1.
K2-SVR-NH10GE basic nearline
These cabling instructions apply to the following:
•
Dell R610 PowerEdge Server NH10GE on a basic nearline K2 SAN.
K2-SVR-NH10GE redundant nearline
These cabling instructions apply to the following:
•
Dell R610 PowerEdge Server NH10GE on a nearline K2 SAN.
Cable K2 RAID
Before cabling, install the K2 RAID chassis in its permanent location. After mounting the chassis
in the rack, you must secure brackets to the front rail to support the Grass Valley bezel. Refer to
related topics in this document for rack mount instructions.
02 February 2012
K2 SAN Installation and Service Manual
57
Cabling K2 SAN devices
This manual is related to the following products: