beautypg.com

K2-svr-nh10ge basic nearline, K2-svr-nh10ge redundant nearline, Cable k2 raid – Grass Valley K2 (Summit 3G) 10Gv2 Storage Area Network Installation v.8.1 User Manual

Page 57

background image

If you have more than one NH1 server, balance servers between controller 0 and controller 1.

K2-SVR-NH10GE basic nearline

These cabling instructions apply to the following:

Dell R610 PowerEdge Server NH10GE on a basic nearline K2 SAN.

K2-SVR-NH10GE redundant nearline

These cabling instructions apply to the following:

Dell R610 PowerEdge Server NH10GE on a nearline K2 SAN.

Cable K2 RAID

Before cabling, install the K2 RAID chassis in its permanent location. After mounting the chassis
in the rack, you must secure brackets to the front rail to support the Grass Valley bezel. Refer to
related topics in this document for rack mount instructions.

02 February 2012

K2 SAN Installation and Service Manual

57

Cabling K2 SAN devices