Circuit Manager

This chapter describes how to build circuits using the SCM Craft
interface. Topics covered are:

Circuit Manager concept

Limitations to the product

Key definitions

Adding and editing circuits

Activating/deactivating a configured circuit

Other general task functions available through the Circuit
Manager menu, such as deleting and searching for circuits

NOTE: Circuit-building done by connecting directly to other modules

is not documented in this chapter. When an SCM is present in

a node, only the SCM Circuit Manager should be used to build

circuits.

Cautions

The following must be considered when you are using an SCM to
build circuits:

If an SCM is moved from one node to another node, it will try
to build the circuits it has stored from the previous node in
the new node. To avoid configuration errors, delete all
circuits from an SCM module before moving it to a new node.

Circuits can only be built within a shelf. Since no data bus
extensions between shelves are possible the node is limited to
one shelf and the modules it contains.

Modules must be present in the shelf and desired port(s)
enabled at the time their circuits are built.

Modules

Supported for

Building Circuits

The Circuit Manager supports the following modules: QUAD T1,
QUAD DATA, M1-3, and IMUX.

Rules

Since a circuit must include a network port,

Table 5-1

shows

possible circuits.