EVCO EVFTFT818P7U Installer manual User Manual
Page 60
![background image](/manuals/675247/60/background.png)
EVCO S.p.A.
EVFTFT818 | Installer manual ver. 2.1 | Code 144FTFT818E214
page 60 of 94
r13
-99
99
°C/°F (1)
15
end temperature of the temperature-controlled hard blast
chilling phase (temperature detected by the needle probe)
r14
10
100
%
60
duration of the time-controlled hard blast chilling phase
(intended as a percentage of the value established with
parameter r1); also duration of the time-controlled soft
deep freezing phase (intended as a percentage of the value
established with parameter r2)
r15
-99
199
°C/°F (1)
65
temperature below which the count of the maximum
temperature-controlled
blast
chilling
and
maximum
temperature-controlled
deep
freezing
is
started
(temperature detected by the needle probe)
r16
0
2
- - - -
1
type of operating cycle that can be selected
0 = blast chilling and storage
1 = blast chilling and storage or deep freezing and
storage
2 = deep freezing and storage
r17
0
99
°C/°F (1)
5
"temperature detected by the needle probe - cabinet
temperature" minimum difference such to consider the first
phase of the test to verify correct insertion of the needle
probe completed successfully (consider the difference
without sign)
0 = the test will not be performed (neither first or second
phase)
r18
1
99
s
60
duration of the second phase of the test for verification of
correct insertion of the needle probe
r19
- - - -
- - - -
- - - -
- - - -
reserved
Par.
Min.
Max.
Unit
Default
Compressor protections
C0
0
240
min
0
minimum time between restoring the power supply after a
power cut, occurring during an operating cycle and
compressor switch-on
C1
0
240
min
5
minimum time between two consecutive compressor switch-
ons (3)
C2
0
240
min
3
minimum time between compressor switch-off and
successive switch-on (3)
C3
0
240
s
0
compressor switch-on minimum duration