beautypg.com

AERCO BMK 6000 Dual Fuel User Manual

Page 91

background image

Benchmark 6000 DF Installation, Operation & Maintenance Manual

CHAPTER 6 – SAFETY DEVICE TESTING

OMM-0096_0B

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

Page 91 of 219

GF-141

Ph.: 800-526-0288

03/21/2014

Blocked Inlet Switch Test – Continued

6.

Cover the combustion air inlet opening with a solid, flat object, such as a piece of thick
plywood or thick metal plate.

7.

The unit should shut down and display AIRFLOW FAULT DURING RUN. This step
confirms proper operation of the Blocked Inlet Switch.

8.

Remove the cover from the air inlet opening and reinstall the Combustion Air Duct or air
filter.

9.

Remove the jumper wires installed in step 2 and replace the black connector boot on the
Flame Detector.

10.

Press the CLEAR button. The unit should restart.

Figure 6-6: Boiler Top View Showing Air Inlet Location

Exhaust

Manifold

COMBUSTION

AIR INLET

(Combustion Air

Duct removed)

HOT WATER

OUTLET

FRONT

REAR