beautypg.com

Change log – AERCO BMK 6000 Dual Fuel User Manual

Page 219

background image

Benchmark 6000 DF Installation, Operation & Maintenance Manual

OMM-0096_0B

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

Page 219 of 219

GF-141

Ph.: 800-526-0288

03/21/2014

© AERCO International,

Inc., 2014

Change Log

Date

Description

Changed By

12/06/2013

Rev A: Initial Release

Chris Blair

03/20/2014

Rev B:
PIR 942: Replaced 460V Power Box labels in
section 2.9
PIR 934-24: Increased max height of housekeeping
pad to 8 inch (Chapter 2)
PIR-960: Replaced all wiring schematics, addition of
24V Sequencing Valve & Flame Rod Amplifier.
PIR-934-31: Removed Dirt Trap from fig. 2-8.
PIR-934-33
: Modified step 13 in Combustion
Calibration regarding defective O

2

Sensor

PIR-934-37: Modified Blocked Inlet Switch Test
instructions, section 6.8.2.
PIR-960: Addition of two sub-sections in 2.10.12;
addition of section 2.15 Sequencing Valve
Installation; addition of section 3.9 _BST Menu;
addition of Chapter 10 – Boiler Sequencing
Technology; replaced all wiring schematics in
Appendix I, addition of 24V Sequencing Valve.
PIR 934-45: Modified Appendix L – Recommended
Spare Parts

Chris Blair