beautypg.com

Configure the communication network – Rockwell Automation 1753-PCS-PAR Using RSLogix Guard PLUS! with GuardPLC Controllers User Manual

Page 109

background image

Publication 1753-PM001A-EN-P - November 2005

Configure the GuardPLC OPC Server B-3

8. In the project tree, right-click Configuration and choose

New>OPC-Server. The OPC server appears in the project tree.

Configure the GuardPLC
System for OPC
Communication

Configure the Communication Network

1. In the Hardware Management window, right-click the OPCtest

Project and choose New>HH-Network.

2. Expand the HH-Network.

3. Right-click Token Group and choose Node Editor.

4. Drag the OPC-Server and G16OPC01 onto the Node Editor.

5. Close the Node Editor.

6. Right-click OPC-Server and choose Edit.

This manual is related to the following products: