E - arcshield plenum installation instructions, Recommended torque values, Plenum bracing – Rockwell Automation MV SMC Flex Motor Controller (for Series K or later) User Manual
Page 195: Appendix e, Arcshield plenum installation instructions, Recommended torque values plenum bracing, Refer to, For a l, Appendix

Rockwell Automation Publication 1560E-UM051F-EN-P - June 2013
185
Appendix
E
ArcShield Plenum Installation Instructions
The following instructions are provided to ensure the proper installation and
function of plenum components supplied with ArcShield enclosures. Refer to
for additional information related to ArcShield plenums before
attempting to follow these instructions.
Recommended Torque
Values
1/4-20 Thread Fasteners – 7.5 N-m (6 lb-ft)
5/16-18 Thread Fasteners – 14 N-m (11 lb-ft)
Plenum Bracing
Bracing of the plenum must be able to withstand the dynamic forces of the arc
fault as well as any other vibration or seismic effects associated with the
installation. Most of this force will be in the direction opposite to where the relief
vent exits. The amount of bracing will depend on how the plenum is supported at
its exit as well as the distance from the end of the cabinets to the exit vent.
•
A flange is available for installing hangers for supporting the weight of the
plenum.
•
The plenum extension has holes for mechanical support.
•
Weight per unit length of Rockwell supplied plenum = 28 kg/m (19 lb/ft).
•
Installer is responsible for ensuring that the plenum extension has
sufficient support to resist the effect of vibrations and seismic effects.
IMPORTANT
Plan the location where the plenum will exhaust (refer to
). Be
aware that equipment in the area of the plenum exhaust may be damaged or
destroyed. The plenum exhaust area is to be marked as a Hazardous Zone, and
labeled per
Figure 84
.