beautypg.com

Figure 29: reserving vertical rack space – Allied Telesis SwitchBlade x8112 User Manual

Page 74

background image

Chapter 3: Installing the Chassis in an Equipment Rack

74

Figure 29. Reserving Vertical Rack Space