beautypg.com

Allied Telesis SwitchBlade x8112 User Manual

Page 217

background image

SwitchBlade x8112 Chassis Switch Installation Guide

217

Figure 146. Lifting the Locking Handle and Removing the Power Supply

12. Do one of the following:

To install a new power supply, refer to Chapter 4, “Installing the
Power Supplies” on page 87.

If you are not installing a new power supply, continue with this
procedure to install a blank slot cover.

13. Place the locking handle on the slot cover in the up position and slide

the cover into the empty power supply slot. Refer to Figure 147 on
page 218
.