beautypg.com

Allied Telesis SwitchBlade x8112 User Manual

Page 11

background image

SwitchBlade x8112 Chassis Switch Installation Guide

11

Figure 110: Attaching the Power Wires to the Straight Terminal Lugs .............................................................................. 157
Figure 111: On/Off Switch on the AT-SBxPWRSYS1 DC Power Supply .......................................................................... 158
Figure 112: Opening the Plastic Cover.............................................................................................................................. 159
Figure 113: Removing the Terminal Screws...................................................................................................................... 160
Figure 114: Connecting the Positive (+) Power Wire with a Straight Terminal.................................................................. 161
Figure 115: Connecting the Negative (-) Power Wire with a Straight Terminal ................................................................. 162
Figure 116: Closing the Plastic Cover over the Terminal Connectors ............................................................................... 163
Figure 117: Tightening the Handle Locking Screw............................................................................................................ 164
Figure 118: Stripping the Power Wires .............................................................................................................................. 165
Figure 119: Attaching the Power Wires to the Right Angle Terminals............................................................................... 165
Figure 120: Removing the Plastic Cover ........................................................................................................................... 166
Figure 121: Removing the Terminal Screws...................................................................................................................... 167
Figure 122: Connecting the Positive (+) Power Wire with a Right Angle Terminal............................................................ 168
Figure 123: Connecting the Negative (-) Power Wire with a Right Angle Terminal ........................................................... 169
Figure 124: Tightening the Handle Locking Screw............................................................................................................ 170
Figure 125: Stripping Solid or Stranded DC Power Wires ................................................................................................. 171
Figure 126: Connecting the Positive Wire With Bare Wire ................................................................................................ 172
Figure 127: Connecting the Negative Lead Wire with Bare Wire ...................................................................................... 173
Figure 128: Switch Initialization Messages........................................................................................................................ 176
Figure 129: Switch Initialization Messages (Continued) .................................................................................................... 177
Figure 130: Connecting the Management Cable to the Console RS-232 Port .................................................................. 182
Figure 131: SHOW VERSION Command.......................................................................................................................... 184
Figure 132: SHOW CARD Command................................................................................................................................ 184
Figure 133: Disconnecting the AC Power Cord from the AC Socket on the Back Panel................................................... 204
Figure 134: Lifting the Locking Handle on the Power Supply ............................................................................................ 205
Figure 135: Removing the Power Supply from the Chassis .............................................................................................. 206
Figure 136: Installing a Blank Power Supply Slot Cover ................................................................................................... 207
Figure 137: Lowering the Locking Handle on the Power Supply Slot Cover ..................................................................... 208
Figure 138: Loosening the Screw on the Locking Handle ................................................................................................. 209
Figure 139: Opening the Plastic Window over the Terminal Block.................................................................................... 210
Figure 140: Removing the Negative Lead Wire................................................................................................................. 211
Figure 141: Removing the Positive Lead Wire from the Terminal Block ........................................................................... 212
Figure 142: Reinstalling the Screws on the Positive and Negative Terminals................................................................... 213
Figure 143: Closing the Plastic Cover ............................................................................................................................... 214
Figure 144: Removing the Grounding Wire ....................................................................................................................... 215
Figure 145: Reinstalling the Nut and Washer on the Grounding Post ............................................................................... 216
Figure 146: Lifting the Locking Handle and Removing the Power Supply......................................................................... 217
Figure 147: Installing a Blank Power Supply Slot Cover ................................................................................................... 218
Figure 148: Lowering the Locking Handle on the Power Supply Slot Cover ..................................................................... 219
Figure 149: Loosening the Screw on the AT-SBxFAN12 Fan Module .............................................................................. 225
Figure 150: Loosening the AT-SBxFAN12 Fan Module from the Backplane Connector................................................... 226
Figure 151: Withdrawing the AT-SBxFAN12 Fan Module 51 mm (2 In.) from the Chassis............................................... 227
Figure 152: Removing the AT-SBxFAN12 Fan Module from the Chassis......................................................................... 228
Figure 153: Installing a New AT-SBxFAN12 Fan Module.................................................................................................. 229
Figure 154: Securing the AT-SBxFAN12 Fan Module on the Backplane Connector ........................................................ 230
Figure 155: Tightening the Screw on the AT-SBxFAN12 Fan Module .............................................................................. 231
Figure 156: Pin Numbers for RJ-45 and RJ Point 5 Ports (Front View) ............................................................................ 239