beautypg.com

Allied Telesis SwitchBlade x8112 User Manual

Page 131

background image

SwitchBlade x8112 Chassis Switch Installation Guide

131

6. Connect the fiber optic cable to the port on the transceiver, as shown

in Figure 84. The connector should snap into the port.

Figure 84. Attaching a Fiber Optic Cable to an SFP Transceiver in the AT-

SBx81GS24a Line Card

7. Repeat this procedure to install additional SFP transceivers.

After installing and cabling the SFP transceivers, do one of the following:

To install and cable additional transceivers, go to the appropriate
section in this chapter for instructions.

After cabling all the ports in the chassis, go to Chapter 7,
“Powering On the Chassis” on page 141.