beautypg.com

Start depth message, Tart, Epth – Ag Leader Intellislope Ver.5.2 Operation Manual User Manual

Page 30: Essage

background image

26

Firmware Version 5.2

Enter a name, tile size, form, manufacturer. Any
notes can be added in the memo section.

Press

when complete.

Once a tile has been created it can be selected to
use in field operation.

S

TART

D

EPTH

M

ESSAGE

The plow may be lowered to any depth at
or below the minimum starting depth,
when installing from the outlet end, or
uphill, as in most cases. Here the plow is
still above the starting depth and a
warning message, “Minimum starting
depth: 24 in.” is given.

If your starting point for the install is in a
location that is in front of your survey, the
“Start Depth message” may be too shallow as
it is reported based on the first point of the
survey. For example - if the start depth is 34"
but you are 30 ft away from the beginning of
the survey, you may have to lower to 35" to
maintain your grade from the start of install to
the start of the survey.

You must be within 65 ft (20 m) of the start of
the survey to be allowed to start installation.

Start Install button will be grayed out until plow has been lower to proper depth.