beautypg.com

Spectra Precision Survey Pro 3.80 Recon GPS Reference Manual User Manual

Page 87

background image

Stakeout Menu

87

)RUFH ),// 6ORSH : forces all computations to be based on a

fill slope.

The second button selects which information is displayed in the lower
corner of the screen from the following options:

9 0DS : displays a cross-sectional view at the current

station.

Note: When you tap a map view, an expanded view of the same map
will fill the screen.

Note: The Vertical Map will show an

X

at the location of each

previous shot. This can be useful in determining if the current
terrain will never intersect the slope (no catch point).

+ 0DS : displays an overhead view of the job.

1(= : displays the coordinates computed from the last

shot.

2FFXS\«: switches the receiver dynamics to static (depending on

settings) and opens the Occupy Data Points screen (Page R-39) where
data can be collected for the current point.

6LGH 6KRW : allows you to store a side shot measurement during stake

out. This button opens a prompt for the side shot point name and
launches the GPS Occupy Data Points screen. After you store the
new point (or cancel) you will resume with the Slope Staking screen.

Results

: displays the results computed from the last

6KRW.

Obs. Slope

: is the computed (observed) cut or fill slope based on the

last shot and the corresponding hinge point.

Des. Slope

: is the design cut or fill slope.

Cut / Fill

: is the cut or fill required for the current rover location to be

positioned on the design slope.