Select/create loop, New level loop – Spectra Precision Survey Pro v4.6 Ranger Reference Manual User Manual
Page 270
Survey Pro Reference Manual
R-262
Select/Create Loop
Leveling Select/Create Loop
.
The Select/Create Loop screen is used to select a loop that has not yet
been closed, view the notes for any existing loop, or create a new level
loop.
Select an Existing Loop: allows you to select
an existing loop from the dropdown list.
Activate Selected Loop : opens the selected loop
so new data can be added to it. (This button
will not be available when a closed loop is
selected.)
View Level Notes for Selected Loop : displays
the notes for the selected loop in the Level
Notes screen, described below.
New Loop > : opens the New Level Loop
screen, described next, where a new loop can be created.
New Level Loop
Leveling Select/Create Loop New Loop >
.
The New Level Loop screen is used to create a
new level loop.
New Loop: is where you enter a name for the
new loop.
CBM: is the starting benchmark. This point
must exist in the current job.
Next > : opens the next screen.