Inspection and maintenance, Inspection and maintenance -1, Caution – Yokogawa Integral Oxygen Analyzer ZR202 User Manual
Page 152
IM 11M12A01-05E
11-1
11. Inspection and Maintenance
11. Inspection and Maintenance
This chapter describes the inspection and maintenance procedures for the EXAxtZR
Zirconia High-temperature Humidity Analyzer (integrated model) to maintain its
measuring performance and normal operating conditions.
CAUTION
When checking the detector, carefully observe the following:
(1) Do NOT touch the probe if it has been in operation immediately just before being
checked. (The sensor at the tip of the probe heats up to 7508 C during operation. If
you touch it, you will get burned.)
(2) Do not subject the probe to shock or cool it rapidly.
The sensor is made of ceramic (zirconia). If the detector is dropped or bumped into
something, the sensor may be damaged and no longer work.
(3) Do not reuse a metal O-ring to seal the cell assembly. If you replace the cell or
remove it from the probe for checking, be sure to replace the metal O-ring. Other-
wise, the process gas may leak, and then the leaking corrosive gas will cause the
built-in heater or thermocouple to go open circuit, or the detector may corrode.
(4) Handle the probe with care so that the dust-filter mounted screws on the tip of the
probe do not hurt your finger(s).
(5) Before opening or closing the terminal box, first remove dust, sand, or the like from
the terminal box cover.