Franklin Fueling Systems TS-DTU Data Transfer Unit Dispenser Retrofit Manual User Manual
Page 19
19
Tokheim Premier B DTU Installation
32. Route power cable along bottom of electrical
enclosure and attach to AC power distribution
board as shown. Ensure that wiring is kept away
from sharp edges and will not interfere with door
closing.
33. Plug the connector from the Tokheim power
harness into available connector on AC power
distribution board.
Figure 15: Connect to AC Power Board
34. Attach ring terminal of ground wire to dispenser
bracket using screw and nut as shown. Coil
excess wiring and secure with tie-wraps to ensure
that it does not interfere with door closing.
Figure 16: Attach Ground Wire
35. Find cable assembly extending from TS-VFM in
dispenser hydraulics enclosure.
36. Find wiring from previously installed potted nipple
assembly inside hydraulics enclosure.
37. Find two wire splice connector kits. Inside
hydraulics enclosure, connect black wire from
potted nipple assembly to black wire from TS-VFM
fl ow meter by putting each lead into an opening in
the wire splice connector and push fi tting closed to
lock.
37. Find cable extending from TS-VPS inside
hydraulics enclosure. Cut yellow and blue leads
from end of cable.
37. Find purple and white wires from potted nipple
assembly in hydraulics enclosure. Strip wiring
insulation 3/8”from end of wire.
40. Using wire nuts provided with kit, attach purple
wire from potted nipple assembly to black wire
of TS-VPS and white wire from potted nipple
assembly to white wire of the TS-VPS.
41. Replace lower hydraulics door to side A and lock
with key.
42. Lift the display assembly back to normal position
and tighten with two attached screws.
43. Lock latch on display cover on B side of dispenser.
44. Close right options door on B side and lock.
45. Close printer door on B side and lock.
46. Close right options door on A side and lock.