beautypg.com

Setting up a verify schedule – Avago Technologies 3ware SAS 9750-4i User Manual

Page 74

background image

Chapter 2. CLI Syntax Reference

66

3ware SATA+SAS RAID Controller Card CLI Guide, Version 10.0

Setting Up a Verify Schedule

Setting up a verify schedule requires several steps, and several different CLI
commands in addition to /cx add verify.

To set up the verify schedule you want to use, follow this
process:

1

Use the /cx show verify command to display the current schedule for
verify tasks. (For details, see page 53.)

2

If any of the scheduled tasks do not match your desired schedule, use
the /cx del verify command to remove them. (For details, see page 68.)

3

Use the /cx add verify command to create the verify schedule slots you
want (described above.)

4

Use the /cx set verify=enable command or the /cx set verify=advanced
to enable the schedule (this enables all rebuild schedule slots). (For
details, see page 71.)

5

Use the /cx/ux set autoverify=on command to turn on autoverify for each
unit you want to follow the schedule. (For details, see page 90.)

Note:

If you do not enable autoverify for units or start a verification manually, no

verifies will run during your verify task schedule, even if the verify schedule is
enabled with the /cx set verify=enable command or the /cx set verify=advanced.

Warning:

If all time slots are removed from the verify task schedule, be sure to

also disable the schedule. Otherwise verify tasks will never occur.