beautypg.com

Emerson Process Management ControlWave XFC User Manual

Page 55

background image

CI-ControlWave XFC

Installation & Operation / 2-13

• all conductive connections or tubing runs between the ControlWave XFC gas flow

computer and a turbine meter, pulse transducer, or any other I/O device that is
mounted on the pipeline

• any Temperature Transducer, Pressure Transmitter, etc. and their mount/interface to

the pipeline.

Figure 2-7 - ControlWave XFC Remote Installation (with Cathodic Protection)

2.3.2 CPU Board Configuration


To configure the CPU Controller Board, DIP-Switch SW1 must be set (see Section 2.3.2.1),
the Backup Battery should be enabled by installing Jumper JP1 onto its posts, and
Communication Ports must be wired (see Sections 2.3.2.2 through 2.3.2.3). The CPU Board
is situated behind the Front/Display Cover (see Figures 2-1 & 2-8).

2.3.2.1 CPU Board Switch SW1 Configuration

ControlWave XFC CPU Board DIP-Switch SW1 must be set for the desired performance
options. Table 2-1 provides an overview of switch settings.

SW1-1 set OFF will disable the system from entering a watchdog state when a crash or
system hangup occurs. Setting SW1-1 OFF prevents the system from automatically
restarting.