Mechanical installation, Electrical installation, Start-up programming & operation – Yaskawa J1000 Compact Vector Control Drive User Manual
Page 4

IP20/NEMA Type 1 Enclosure ............................................... 34
Front Views ....................................................................... 37
2. MECHANICAL INSTALLATION .................................. 39
2.1 Mechanical Installation .................................................... 40
Installation Environment ....................................................... 40
Installation Orientation and Spacing........................................ 41
Exterior and Mounting Dimensions ......................................... 43
3. ELECTRICAL INSTALLATION.................................... 51
3.1 Standard Connection Diagram......................................... 52
3.2 Terminal Block Configuration.......................................... 55
3.3 Protective Covers ............................................................ 56
IP20/Open-Chassis Front and Bottom Cover Removal and
Installation ....................................................................... 56
IP20/NEMA Type 1 Front and Bottom Cover Removal and
Installation ....................................................................... 57
IP20/NEMA Type 1 Top Cover Removal and Installation ............. 59
3.4 Main Circuit Wiring .......................................................... 61
Main Circuit Terminal Functions ............................................. 61
Wire Gauges and Tightening Torques ..................................... 61
Main Circuit Terminal Power Supply and Motor Wiring................ 66
3.5 Control Circuit Wiring...................................................... 68
Control Circuit Terminal Block Functions.................................. 68
Terminal Configuration......................................................... 70
Wiring Procedure ................................................................ 72
3.6 I/O Connections ............................................................... 74
Sinking/Sourcing Mode Switch............................................... 74
3.7 Main Frequency Reference .............................................. 77
DIP Switch S1 Analog Input Signal Selection ............................ 77
3.8 Wiring Checklist .............................................................. 79
4. START-UP PROGRAMMING & OPERATION ............ 81
4.1 Using the Digital LED Operator........................................ 82
Table of Contents
4
YASKAWA ELECTRIC TOEP C710606 47C YASKAWA AC Drive – V1000 Quick Start Guide