beautypg.com

Installing a subcard – H3C Technologies H3C S10500 Series Switches User Manual

Page 31

background image

21

Figure 17 Rotating up the ejector levers on a base card

8.

Fasten the captive screws on the card.

9.

When the switch is powered on, verify the running status of the card.
You can verify the running status of a card by referring to the card status LED (SLOT) on the MPU
of the switch. If the RUN LED flashes, the card in the slot operates correctly. For more information

about card status LED (SLOT), see "

Appendix C LEDs

."

Figure 18 Installing a card

Installing a subcard

IMPORTANT:

To ensure good ventilation, install a blank filler panel in an empty subslot.

This section describes how to install a subcard in a base card. Subcards are hot swappable.
To install a subcard: