beautypg.com

Installation on jacketed fiber – Legrand OR-205KAN9GB-MM User Manual

Page 60

background image

Page 53

OptiMo Connector Installation Instructions

18

Unclamp the cord. Carefully remove the connector from the installation tool. Hold the crimping tool
vertically and rest the crimping tool against the disposable tool tab to ensure it is aligned properly. The
disposable tool must be rotated in order for it’s tab to be pointing at the crimp tool handle. Using the first
and smallesr die (,068 hex) on the crimping tool, strongly crimp the stem on the buffer at the “buffer
crimp area”, making sure neither the jacket nor any aramid yarn is in the way. The smallest diameter hex
face is against the disposable tool tab.

Buffer crimp area

*

Make sure that the crimp tool you are using is in proper operating condition before attempting this step. Also make sure that the tool is set to the
settings shown in the Technical Bulletin—OptiMo

®

Field Installable Connectors document that is provided with your Ortronics

®

Field Installation Kit.

(The document can be downloaded from the Ortronics web site at

http://www.legrand.us/ortronics/technicalresources/instruction%20manuals.aspx)

LC

Installation on jacketed fiber