Installation on jacketed fiber, Lc sc st – Legrand OR-205KAN9GB-MM User Manual
Page 40

Page 33
Installation on jacketed fiber
OptiMo Connector Installation Instructions
1
connector body
connector body
LC
SC
ST
Accessories
crimp sleeves
strain relief boots
2.0 mm
2.0 mm
3.0 mm
22 m
mm
m
33 m
mm
m
3.0 mm
Cord adapter
crimp sleeves
3mm strain relief boots
3mm strain relief boots
3.0 mm
2.4 mm
crimp sleeves
rear housing
3.0 mm
2.4 mm
Open the connector bag and the accessories
bag. Select the appropriate parts required for
installation on 2.0mm or 3.0mm jacketed
fiber. (Connector body, crimp sleeve and
strain relief boot)
Open Open the bag of materials and take out the
connector body and the rear housing. In order to
select the crimp sleeve, you need to first
determine the outer diameter of the cable jacket
you are installing. The appropriate crimp sleeve
for a cord, size from 2.0 mm to 2.4 mm is the 2.4
mm sleeve. For a cord size from 2.5 mm to
3.0 mm, use the 3.0 mm crimp sleeve.
1a) Before you start an installation on jacketed
fiber, you need to determine the installation
method (there are two) and the parts you are
going to need. You simply have to determine the
outer diameter of the cable jacket you are
installing the connector on.
connector body
- OR-205KAN9GA-MM OR-205KAN9GB-SM OR-205KAN9GA-SM OR-60300128 OR-60300126 OR-205KAN9FB-MM OR-205KAN9FA-MM OR-205KAN9FB-SM OR-205KAN9FA-SM OR-205KAN9EB-MM OR-205KAN9EA-MM OR-205KAN9EBSM OR-205KAN9EA-SM OR-205KAS9GB-50T OR-205KAS9GA-50T OR-205KAS9GB-62 OR-205KAS9GA-62 OR-205KAS9GB-09 OR-205KAS9GA-09 OR-205KAS9FB-50T OR-205KAS9FA-50T OR-205KAS9FB-62 OR-205KAS9FA-62 OR-205KAS9FB-09 OR-205KAS9FA-09 OR-205KAS9EB-50T OR-205KAS9EA-50T OR-205KAS9EB-62 OR-205KAS9EA-62 OR-205KAS9EB-09 OR-205KAS9EA-09