beautypg.com

10 unpacking and installing the unit, Ab c, Am series boilers and water heaters – AERCO AM Series Boiler User Manual User Manual

Page 32

background image

AM Series Boilers and Water Heaters

CHAPTER 3 – INSTALLATION

Page 32 of 156

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0100_0B

PRI - 07/14/14

Ph.: 800-526-0288

GF-146

3.10 Unpacking and Installing the Unit

Unpacking Instructions

1. Remove the outer shipping carton from the water heater.

2. Remove the lower front cover “A” at front of the unit by pulling it forward to access and

remove the screw and washer “B” (Figure 3-3).

Figure 3-3: Removing the Unit from Wood Pallet (Front)

3. Remove the screw and washer “C” at the rear of the unit (Figure 3-4).

Figure 3-4: Removing the Unit from Wood Pallet (Rear)

A

B

C