beautypg.com

Cooper Instruments & Systems DFI INFINITY B Ultra High Performance Digital Force Indicator User Manual

Page 29

background image

Figure 7-18. Potentiometer Connections with Internal Power

Supply and Ratio Measurement

Figure 7-19. Potentiometer Connections with External Power

Supply and Ratio Measurement (Remove jumper S2-G)

7.5 Cold Junction Compensation Board Installation for Thermocouples

To setup the rear protective cover with the P3 and P9 connectors (and Cold-Junction Compensation Board), proceed with
the following (Refer to Figure 7-20).

1) Obtain P3 and P9 connectors and the thermocouple rear protective cover.
2) Put the two (2) connectors P3 and P9 into the corresponding male connectors at the rear of the meter. Refer to

Figure 4-3 for the location of the male connectors. P3 and P9 are identical and interchangeable connectors.

3) Using a long slotted screwdriver (one that is at least 4” long), loosen the 6 screws on the connectors.
4) Carefully install the thermocouple rear protective cover onto the connectors making sure the pins in the rear cover

make good contact with the holes in the connectors.

5) Tighten the 6 screws (do not over-tighten).
6) Fasten down the cover with the cover mounting screw.

Figure 7-20. Installation of Thermocouple Cold-Junction Compensation

Board Assembly

CF 156

24

M2544/N/0505