Installation and delivery check list, Installation, Delivery – Class1 FoamLogix 2.1A & 1.7AHP REV D User Manual
Page 51
![background image](/manuals/545174/51/background.png)
FoamLogix, Model 2.1A and 1.7AHP Class “A”
Electronic Foam Proportioning Systems
51
INSTALLATION AND DELIVERY CHECK LIST
After the Hale FoamLogix system is installed, use the following check list to verify installation and ensure proper
system setup when the apparatus is delivered to the end user.
INSTALLATION
DATE INITIALS
_______
________
❑
System properly installed. (Review “Start-Up Check List” on page 48.)
______
_______
❑
Tank level sensor function verified. (Review “System Installer Start-Up” on page 49.)
_______
________
❑
F
oam pump operation checked. (Review “System Installer Start-Up” on page 49.)
_______
________
❑
Foam tank and hoses drained of water. (Review “System Installer Start-Up” on page 49.)
_______
________
❑
Flow sensor function checked and calibrated. (Review “User Calibration” on page 53.)
DELIVERY
DATE
INITIALS
_______
________
❑
Foam tank filled with user specified foam concentrate. (Compies with Hale approved
concentrate compabibility list.)
_______
_______
❑
Foam pump priming checked.
_______
_______
❑
Flow sensor calibration verified with Pitot.
_______
________
❑
Default simulated flow value set to end user specification.
_______
_______
❑
Default foam concentrate injection rate set to end user specification.
_______
_______
❑
Foam concentrate feedback value verified and calibrated with end user specified foam.
_______
________
❑
Proper Hale FoamLogix system operation demonstrated to end user in accordance
with manual procedures.
DATE INITIALS
______
______
❑
End user trained in proper operation of Hale FoamLogix system in accordance
with manual procedures.
______
______
❑
Warranty registration card filled out by end user and mailed to Hale Products.
______
______
❑
T
wo copies of Description, Installation and Operation manual provided to end user.