beautypg.com

Start up and operation, 1 overview, 2 critical parameters – Pulsafeeder MPC Vector User Manual

Page 18

background image

12

6. Start Up and Operation

6.1 Overview

Once all electrical connections have been made, your MPC VECTOR is ready for setup and operation. The
following sections detail the procedures required to complete the MPC VECTOR start up.

W

HEN POWER IS SUPPLIED TO THE UNIT

,

LINE VOLTAGE IS PRESENT WITHIN THE

MPC

VECTOR

ENCLOSURE EVEN WHEN THE

M

OTOR IS

OFF.

D

URING

S

TART

-

UP

,

IT IS NECESSARY TO RUN THE PUMP MOTOR

.

T

HIS WILL CAUSE FLUID TO

DISCHARGE FROM THE PUMP

.

Y

OU ARE RESPONSIBLE FOR SAFELY DIVERTING FLOW FROM THE

PUMP DURING START

-

UP AND CALIBRATION

.

6.2 Critical Parameters

For proper operation of the MPC VECTOR control, at startup the following parameters and calibrations must
be entered and/or verified:

Parameter(s)

Reference IOM Section

Pump maximum flow

Section 6.6

Flow meter calibration (if using this feature)

Ref flowmeter IOM as required

Flow calibration in speed mode

Section 8.2

Motor calibration for Vector mode

Section 10

4-20 mA analog signal calibration

Section 8.3

Flow meter type setup

Section 9