beautypg.com

Allied Telesis AT-SBx31CFC960 User Manual

Page 130

background image

Chapter 7: Installing the AT-SBx31CFC960 Card and Ethernet Line Cards

130

Figure 70. Removing the Battery Insulator

5. Move the locking handles on the front panel to the open position, as

shown in Figure 71.

Figure 71. Opening the Locking Handles on the AT-SBx31CFC960

Controller Fabric Card

6. Align the edges of the AT-SBx31CFC960 Controller Fabric Card with

the internal chassis card guides in slot 4 or 5 of the AT-SBx3112
Chassis. Figure 72 on page 131 shows the AT-SBx31CFC960 Card
aligned in slot 4.

This manual is related to the following products: