beautypg.com

Vanguard DigiTMR S2 User Manual

Page 101

background image

REV 1 DIGITMR S2 USER’S MANUAL

96

3.11.3.

Printing the Breaker Test Plan Directory

Follow the steps below to print a directory of all the test plans stored in the DigiTMR S2’s
EEPROM:

a. Start from the “START-UP” menu:

Press the

[3]

key (SETUP).

b. The following screen will be displayed:

Press the

[1]

key (ANALYSIS POINTS).

c. The following screen will be displayed:

Press the

[4]

key (TEST PLANS).

d. The following screen will be displayed:

Press the

[3]

key (PRINT DIRECTORY).

1. LOAD TEST PLAN
2. PRINT TEST PLAN
3. PRINT DIRECTORY



1. OPEN TIMING
2. CLOSE TIMING
3. PRINT SETTINGS
4. TEST PLANS


1. ANALYSIS POINTS
2. MEASUREMENT UNITS
3. SAVE / RESTORE
4. SHOT DESCRIPTION
5. NEXT PAGE

1. TIME BREAKER
2. GET RESULTS
3. SETUP
4. DIAGNOSTICS