Index – Luminex 100 IS User Manual, Version 2.1 User Manual
Page 179

PN 89-00002-00-070 Rev. A
1
Symbols
4
A
about device 67
about IS 68
software 68
access doors 7
accessories 11
see accessory instructions 11
see user manual 11
accuracy and precision
specifications 4
acquisition area 3
add new lot button 46
add sheath fluid 9
additional equipment 7
bar code labels 7
uninterruptible power supply (UPS) 7
vortex 7
additional equipment, uninterruptible power
supply (UPS) 7
additional software 3
adjust
Sample Probe, vertical height 10
adjust Sample Probe 10
adjust vertical height 10, 2, 11
after running samples
sanitize 2
wash twice 2
air filter
product number 1
air intake filter 3
location 4
product number 1
replace 4
air intake filter, Luminex 100 instrument
replace
semi-annual 3
air intake filter, XYP instrument
replace semi-annual 4
alarms, SD system 5
alignment discs 10
alignment guide 10
analysis, begin 52
analyzer 1
analyzing results 2
annual
change the sheath filter 8
APD temperature range exceeded 5
as required
sheath waste fluids 9
assay calibrators 1
assay controls 1
assay kit 2
kit provider
questions 2
assay kits
kit manufacturer 1
assemble and power system 1
assemble system 1
assign dilution factors to samples
dilution factor 52
audible alarms 5
automatic 12
automatic analysis 53
avoid
shining beam into eyes 7
staring into beam 7
avoid beam exposure 6
avoid exposure 6
B
back up the database 64
Index