LRS-24 Installation and Operation Manual

2

LRS-24 with CM-2 Module

2. LRS-24 with CM-2 Module

This section contains the startup instructions for LRS-24 with the CM-2 module.

Power-On

To turn the power on:

1. Set the ON/OFF switches on the panels of the LRSI-PSP** modules to ON.
2. Supply the DC power, as applicable.

To supply external phantom feed voltages:

1. Turn on LRS-24.
2. Turn on the source (for example, LRS-PS-FEED).

Normal Indications

PS Module(s): All the indicators on the panel(s) of the PS module(s) must light

in green to indicate proper operation.

CM-2 Module: The POWER indicator of the module must light. The TD and

RD indicators may flash (or light steadily) when a management session is in
progress.

Normally, the STAT/ADD display shows the two least significant digits of the
management number assigned to LRS-24. For normal startup, a rotating red circle
is displayed. However, if a problem is detected during the power-up self-test, you
will see a flashing error code (E1 through E9).

Preliminary Configuration

Perform preliminary configuration on the LRS-24 hub (see Chapter 4).