Cm-1 module – RAD Data comm LRS-24 User Manual
Page 36
Chapter 2 Installation and Setup
LRS-24 Installation and Operation Manual
2-8
Installation and Setup
PS Module Installation
➤
To install the first PS module:
1. Make sure that the POWER switches on the two LRSI-PS interface modules are
set to OFF.
2. Insert the specified PS module in the PS-A slot, referring to the system
installation plan in LRS-24 Module Slots, Chapter 1.
3. Fasten the PS module with the two screws.
4. If an additional redundant module is used, install it in the PS-B slot.
You can install a redundant module in an operating enclosure without turning off
the enclosure power. After the module is installed, connect the power cable and set
the power switch located on the corresponding interface module to ON.
An AC and a DC PS module can be installed at the same time.
CM-1 Module
This section covers installation of the CM-1 module and of the associated interface
module in an LRS-24 enclosure. The first part covers the installation of the CM-1
module. The second section covers the installation of the interface module for the
CM-1 module: LRSI-F-CM1.
Front Panel
A typical front panel for the CM-1 module is shown in Figure 2-4. The functions of
the components located on the front panel are listed in Table 2-2.
Note
Order from: Cutter Networks
Ph:727-398-5252/Fax:727-397-9610
www.bestdatasource.com