beautypg.com

Cm-2 module, Cm-1 installation procedure, Front panel – RAD Data comm LRS-24 User Manual

Page 40: Figure 2-6. module cm-2 front panel

background image

Chapter 2 Installation and Setup

LRS-24 Installation and Operation Manual

2-12

Installation and Setup

CM-1 Installation Procedure

To install CM-1:
• Insert the CM-1 module into the CL slot, and fasten it with the two screws.

CM-2 Module

This section covers the installation of the CM-2 module in an LRS-24 enclosure.

Front Panel

A typical front panel for the CM-2 module is shown in Figure 2-6. The functions of
the components located on the front panel are listed in Table 2-4.

STAT/ADD

Power Indicator

Management Transmit
Activity Indicator

Management Receive
Activity Indicator

Status/Address
Display

POWER

TD

RD

CONTROL

R
S

2
3
2

CM-2

Figure 2-6. Module CM-2 Front Panel

Order from: Cutter Networks

Ph:727-398-5252/Fax:727-397-9610

www.bestdatasource.com