Installation and setup, Chapter 2 installation and setup – RAD Data comm LRS-24 User Manual
Page 29
Introduction
2-1
Chapter 2
Installation and Setup
This chapter provides installation and operation instructions for the LRS-24 system,
and the basic system configuration of the power supply (PS) and common logic
(CM-1 and CM-2) modules. It includes the following topics:
• Site requirements and prerequisites
• Equipment needed
• Package contents
• Installation and setup
• Interfaces and connections
• Initial operation and basic checks
See Chapter 3 for management via a CM-1 module and Chapter 4 for
management via a CM-2 module.
2.1 Introduction
If LRS-24 includes a CM-2 module, you must configure management parameters
of the CM-2 module before the management functions are operable. This
procedure is explained in Chapter 4.
After installing the basic system, install the user modules according to the system
installation plan, as explained in the Installation and Operation Manual of the
individual modems.
No internal settings, adjustment, maintenance, and repairs may be performed
by either the operator or the user; such activities may be performed only by a
skilled technician who is aware of the hazards involved.
Always observe standard safety precautions during installation, operation, and
maintenance of this product.
Mechanical Data
Figure 2-1 provides mechanical data on the LRS-24F chassis. Figure 2-2 provides
mechanical data on the LRS-24B chassis.
Warning
Order from: Cutter Networks
Ph:727-398-5252/Fax:727-397-9610
www.bestdatasource.com