3 connection to pbx’s – Nortel Networks DCT1900 User Manual
Page 299
Technical Product Manual - DCT1900
Installation Instructions, Modular Cabinet – DLU Cabling
Install-DCT1900/R8/mw
24-3
© 2000-2005
24.3
Connection to PBX’s
Connecting the DLUs to the PBX
1.
Screw the shielding clamp of AWS1019 to the furthest left free position on the ground strip
using two M3 x 10 torx screws delivered with the Modular Cabinet.
2.
Connect the RJ-45 terminated end of the DLU cable by matching the labeled terminations with
the corresponding board position indicated in Fig. 24-2.
3.
Connect the male AMP connector to the 66 block.
4.
If 66 blocks are not permissible in the switch room due to preference or standardization
practices the AMP connector may be cut off and the cable may be punched down in standard
telecom color code. See Table Fig. 24-1 for the pinout of the AWS1019 DLU/MDF Cable.
- T7316 (188 pages)
- T7316E (2 pages)
- T7316 (2 pages)
- i2050 (56 pages)
- NN10300-009 (80 pages)
- NN43112-107 (46 pages)
- NN40050-109 (20 pages)
- 1120E (25 pages)
- 4065R (92 pages)
- Enterprise Edge M7324N (6 pages)
- 2007 (54 pages)
- NN42030-102 (78 pages)
- LDP7004 (1 page)
- MCC 3100 (78 pages)
- LIP-6812 (21 pages)
- 1120 (160 pages)
- CallPilot Desktop Messaging (72 pages)
- Companion MICS-XC (138 pages)
- jAZZ X-6000 (28 pages)
- Meridian M3901 (2 pages)
- Meridian M3902 (146 pages)
- NN42030-101 (108 pages)
- P0609347 02 (8 pages)
- BCM50 (280 pages)
- i2021 Series (77 pages)
- 3100 (72 pages)
- BCM1000 (347 pages)
- C3050 REV2 (42 pages)
- N0035509 (90 pages)
- Enterprise Edge Feature Programming Telephone (170 pages)
- Meridian M3904 (2 pages)
- 6300 (138 pages)
- NN42030-107 (112 pages)
- ATA 2 (16 pages)
- IP Phone 2002 (2 pages)
- 414X (52 pages)
- BST Doorphone (18 pages)
- Regular Telephone (27 pages)
- M2008HF (74 pages)
- Business Communications Manager (BCM) & Norstar Installation (81 pages)
- 1000E (468 pages)
- M2016S (24 pages)
- 2050 (46 pages)
- CallPilot 150 (68 pages)
- BSG12 (2 pages)