Chapter 1, Introduction, 1introduction – Nortel Networks DCT1900 User Manual
Page 145
Technical Product Manual - DCT1900
Installation Instructions, Introduction
Install-DCT1900/R8/mw
1-1
© 2000-2005
C
HAPTER
1
Introduction
This section describes how to install the DCT1900 system. It comprises information about required
tools, firmware, recommended board positions, cabling of system and power supplies, system
cabinets, Base Stations and field–replaceable units such as power supplies and System Boards.
This section is set–up in a modular format. Each component of the system is described in
separate chapters.
Chapter 1
: Introduction
Introduces you to this document.
Chapter 2
: General
Informs you about environmental conditions, ESD handling, tools and
other items you need for installation.
Chapter 3
: Installation steps for the Modular Cabinet
Gives all installation steps for the Modular Cabinet in sequence. For
more detailed information, references regarding certain aspects are
given to other chapters or other sections of the manual.
Chapter 4
: Modular Cabinet
Describes the mounting of the Modular Cabinet.
Chapters 5-15
: System Boards
CPU, CLU, CLU-S, SLU, SPU-S, DTU-E1(CAS, CCS),
DTU-T1(CAS,CCS), LTU, DLU.
Chapter 16
: Base Station
Chapters 17-18
: Connection Boards
MCCB and SDB
Chapters 19-24
: Cabling for the Modular Cabinet
Describes the installation of all cables for the Modular Cabinet.
Chapter 25
: Use of TDR
Chapter 26
: Modular Cabinet Cables
Describes all cables for the Modular Cabinet.