beautypg.com

Nortel Networks DCT1900 User Manual

Page 273

background image

Technical Product Manual - DCT1900

Installation Instructions, Modular Cabinet – CPU Cabling

Install-DCT1900/R8/mw

20-9

© 2000-2005

Fig. 20-7 CPU2 Sync Cable for up to 2 REs

CPU2 to CPU2 - More than 2 REs (Figure 20-8)
When connecting more than 2 REs together using CPU2, it will be necessary to cut the supplied
cable, AWS1153, and terminate it to a punch-down block. From the master CPU2, the outputs will
be on the blue, orange, and green pairs. Cross-connect each output to the orange pair of each
slave’s cable. Measure the delay of each cable, and enter the value into each slave’s
configuration in nanoseconds.

Master

Slave 1

Out

Out

In

In

AWS 1153