beautypg.com

Nortel Networks DCT1900 User Manual

Page 268

background image

Technical Product Manual - DCT1900

Installation Instructions, Modular Cabinet – CPU Cabling

20-4

Install-DCT1900/R8/mw

© 2000-2005

Fig. 20-3 Cable Tie Blocks on the Ground Strip

Connection to the PC, Printer, and SMS System
1.

Connect PC cable (TSRNB 101 22D) to the PC connector on the MCCB and to the PC.

2.

Connect the printer cable (TSRNB 101 23) to the PR connector on the MCCB and to the
printer. For Short Message Service (SMS), connect the printer connector on the MCCB to the
RS232 on the PC running the SMS application using cable TSRNB 101 23 (DB25) or TSRNB
101 22D (DB9).

3.

Fasten the cables to the cable tie blocks on the ground strip (see Figure 20–3) using tie wraps.

A

B

Cable tie blocks