beautypg.com

Moving the cabinets – Powerware 9170+ User Manual

Page 19

background image

Installation Setup

15

Powerware

®

9170 User's Guide

S

LTM-1344 B Uncontrolled Copy

Mounting Centers for 5/16I (8-mm) Floor Bolts

Dimension (see Figure 12)

Measurement

A

14.5I (36.8 cm)

B (3- and 6-slot cabinets)

30.25I (76.8 cm)

B (9- and 12-slot cabinets)

34.25I (87 cm)

B

A

Floor Anchor

Bracket

Figure 12. Floor Anchor Brackets Bolted to UPS Cabinet

Moving the Cabinets

The Powerware 9170 UPS and the battery cabinet are very heavy with

power and battery modules installed. Before moving the cabinets,

remove the power and battery modules and move these modules

separately from the cabinets.
The smaller (3- and 6-slot) cabinets may be ordered with a caster cart, to

enable moving the cabinet. Caster Cart Installation" on page 10

describes how to set the four foot pads on this cart to keep the cabinet

from rolling when properly positioned.
The larger (9- and 12-slot) cabinets have casters built into the cabinet

base. Use the following procedure to raise the cabinet before rolling it

on its casters. For 12-slot cabinets that do not have output isolation, see

Stabilizer Bracket Installation" on page 11, for details about mounting

stabilizer brackets before rolling the cabinet into place.

1. Ensure that the cabinet contains no power or battery modules.
2. Locate the four plastic caps covering the caster bolts. They are

at the corners of the cabinet base.