beautypg.com

Nstallation, Etup, Equipment clearances – Powerware 9170+ User Manual

Page 11

background image

7

Powerware

®

9170 User's Guide

S

LTM-1344 B Uncontrolled Copy

C H A P T E R

2

I

NSTALLATION

S

ETUP

This chapter explains how to setup and install the Powerware 9170

cabinets:
S Unpacking and setup, including clearances and location requirements
S Caster cart installation
S Stabilizer bracket installation (for 12-slot cabinets with non-isolated

output)

S Rack-mount installation
S Floor anchor kit installation
S Moving the cabinets

Equipment Clearances

All cabinet sizes require the following clearances to allow for servicing

and adequate ventilation:
S From the side panels: 6I (15.2 cm)
S Top and back: 12I (30.5 cm)
S Front: 36I (91.5 cm)
If flexible conduit connects the UPS to the service input and load

distribution panels, you may be able to gain access for servicing by

moving the UPS. If this is the case, you must still leave 12I (30.5 cm)

clearance at the back and 6I (15.2 cm) at the sides of the UPS for

ventilation.

NOTE Do not block the ventilation holes on each side and the back of the unit.

Nine- and 12-slot external battery cabinets may be installed with bases

tight against the UPS cabinet base and against each other. Six-slot

cabinets require 6I of separation.